Modify the project offset

When the project is replaced with new equipment,You need to add an offset to the project to ensure that the total power generation = the total power generation of new equipment + the total power generation of old equipment

such as, request: http://api.dessmonitor.com/public/?sign=7f220b6f21d0b52d0452d9c66ffe1f4f84635b81&salt=2337424845041575962&token=91a6c87e89acbfb2fa482f3b02ee071ee58ea0293dd92f243a88ee51415f497f&action=editPlantEnergyOffset&plantid=752&energyOffset=280.1233&source=1&_app_client_=android&_app_id_=com.demo.test&_app_version_=3.6.2.1

parameter description required
action editPlantEnergyOffset true
plantid Project id true
energyOffset Data offset, receive units:KW/H ,if data larger than this unit,needs to be converted by itself true

response: no text

{
    "err":0,
    "desc":"ERR_NONE"
}

possible error:

Returns an error code description detailed description
0x0006 ERR_FORMAT_ERROR parameter error

results matching ""

    No results matching ""